
ABOUT SHUN HUNG 關於我們
順鴻水喉渠務工程有限公司(前身: 順鴻工程有限公司) 成立於1987年,由創辦人盧慶全先生及王貴蓮女士創立,當年辦公室位於火炭華樂工業中心,參與的工程包括豪景花園、碧濤花園、創紀之期二期、太子望角堂教堂及鴻圖道一號。
2006年順鴻水喉渠務工程有限公司取代順鴻工程有限公司; 完成工程包括淺水灣129號、九龍城豪門及御豪門等。
2009年公司搬遷到九龍灣環球工商大廈; 完成工程包括九龍城御門前、西貢銀海峯、太子薈賢居、新都城商場、新港城商場等。
2018年公司搬遷到觀塘鴻圖道一號; 完成工程包括沙田新城市廣場維修、沙田戲院、土瓜灣北帝街38號等。
Shun Hung P&D Engineering Limited, previously known as Shun Hung Engineering Limited, was founded in 1987 by Mr. LO Hing Chuen and his wife Ms. WONG Kwai Lin. The office was located at Wah Lok Industrial Building at Fotan. During that time they have completed P&D work at Hong Kong Garden, Pictorial Garden, Millennium City Phase 2, Mongkok Church and No.1 Hung To Road, Kwun Tong.
Shun Hung P&D Engineering Limited registered in 2006, replacing Shun Hung Engineering Limited. Completed projects including The Lily at Repulse Bay, Le Billionaire and Billionaire Royal at Kowloon City.
The company was moved to International Plaza at Kowloon Bay in 2009, during those time Shun Hung has completed projects such as Billionnarire Avant at Kowloon City, L'hotel Mongkok, Metro City Plaza renovation and MOS Town Renovation.
Shun Hung moved to its current address at No.1 Hung To Road Kwun Tong in 2018. The latest projects included renovation at New Town Plaza and cinema at Shatin and Downtown 38 at To Kwa Wan.



